home

info@loureiro.com copy right ©Loureiro Engineering Associates, Inc. All Rights Reserved.

Structural
 
Conard High School
West Hartford, CT
 
  Addition and Renovation Project Summary:
BJFW provided structural engineering services for the addition and renovation of Conard High School in West Hartford, Connecticut. The existing high school has a gross area of 230,000 square feet and consists of one, two and three story buildings. Alterations were performed on approximately 22,000 square feet of the existing building. In addition, approximately 50,000 square feet of new one and
two story steel framed buildings were constructed at various locations around the school building.

  Poquonock School, Windsor, Connecticut
Structural Investigation and Emergency Repair
    Project Summary:
This project represents the broad scope of BJFW expertise. The Poquonock School suffered structural damage during the tornado that swept through the Bradley Field, Route 75 Windsor Locks/Windsor area in the late summer. With school having just started for the year BJFW performed a structural investigation and emergency repair project. Following this work mechanical and electrical engineering design for general renovations was added to the scope of BJFW service.