PCB Remediation & Restoration Pond, Brook and Wetland
    United Technologies Corporation (UTC) Pratt & Whitney Division retained Loureiro Engineering Associations, Inc. (LEA), to design and perform the remediation of polychlorinated biphenyls (PCB) contaminated soil and sediment within and immediately surrounding Willow Brook and Willow Brook Pond at the Pratt & Whitney facility in East Hartford, CT.
The overall objective of the remediation project was to physically remove from the site, via excavation and off-site disposal, all soil and sediment containing total PCB concentration in excess of 25 mg/kg and then install a geotextile, soil and rock cap (engineered control) over the entirety of Willow Brook Pond and the open channel of Willow Brook from Willow Brook Pond to Main Street.
  Prior to remediation, LEA was required by the Inland Water Resources Division of the Department of Environmental Protection to assess alternative courses of action. After careful evaluation of all feasible and applicable alternatives, the soil within the wetland area was excavated to concentrations of 25 ppm PCBs or less and a cap was installed.
As a design / build project, prior to implementation of construction activities, LEA prepared all design drawings and technical specifications necessary to support permitting activities and direct efforts during construction activities.

The services provided were as follows:
• Alternatives assessment
• Remediation of PCB contaminated soil and sediments
• Permitting
• Design / build
• Environmental Land Use Restriction (ELUR)